# Bathroom Remodel with Marble Bath Tub / Shower Enclosure

![Remodeled Bathroom Vanity](https://www.stevewaybuildersllc.com/hs-fs/file-16071896-jpg/images/remodeled_vanity_with_stool.jpg?width=319&height=240&name=remodeled_vanity_with_stool.jpg)The homeowner's of this East Lansing, Michigan home contacted Steve Way Builders, LLC to address issues with their only full bathroom. The bathroom was in desperate need to gain some extra space. With low ceilings and a poorly designed floor plan, Steve Way Builders, LLC took to the drawing board to make this bathroom more livable and practical.

The first design step taken to gain more space in the bathroom was to remove the dropped bulkhead in the shower area. The original shower/tub space had a curved bulkhead which drastically reduced head space in the shower. Once removed, the ceiling in the shower followed the pitched ceiling of the roof line, gaining necessary headroom.

The second change to gain additional space was to redesign the bathroom's overall floor plan. A main concern was to adjust the layout of the bathroom to replace the 12" deep vanity to a full depth, 21" vanity. The entrance door needed to be moved to provide room for the new vanity. The bathroom linen closet was removed and space was borrowed from the adjacent hallway closet to provide for the additional space needed to make this change.

The completed bathroom remodel features many new additions. The remodeled vanity area features a 48" wide maple vanity by Schrock, which is accented by a matching framed mirror. The vanity is topped with a US Marble counter top. The recessed lavatory features a satin nickel fixture supplied by Delta. A Kohler high profile toilet is now installed in its new location next to the bathroom vanity.

Walking across the new Mannington engineered hardwood floors will present you in front of the new Aker tub with US Marble custom cut shower walls. The shower features a Delta satin nickel faucet and hand shower unit, as well as a satin nickel Basco sliding shower door. The reworked linen closet in the bathroom consists of clear coated shelves and Schrock cabinet face frames and doors to match the Schrock vanity..

![Made in America Remodeling](https://www.stevewaybuildersllc.com/hs-fs/file-16042745-jpg/images/american_flag.jpg?width=23&height=18&name=american_flag.jpg)Made in America Products: Basco Shower Door, Quaker Windows![Remodeling for Made In America](https://www.stevewaybuildersllc.com/hs-fs/file-16042745-jpg/images/american_flag.jpg?width=23&height=17&name=american_flag.jpg)

| Before ![Old Bathroom Vanity](https://www.stevewaybuildersllc.com/hs-fs/file-16070332-jpg/images/old_bathroom_vanity.jpg?width=180&height=240&name=old_bathroom_vanity.jpg) | After ![Remodeled Bathroom Vanity](https://www.stevewaybuildersllc.com/hs-fs/file-16071341-jpg/images/remodeled_bathroom_vanity.jpg?width=180&height=240&name=remodeled_bathroom_vanity.jpg) ![Remodeled Bathroom Vanity and Framed Mirror](https://www.stevewaybuildersllc.com/hs-fs/file-16071829-jpg/images/remodeled_vanity__and_framed_mirror.jpg?width=180&height=240&name=remodeled_vanity__and_framed_mirror.jpg) |
| --- | --- |
|  ![Old Shower and Stool Before Remodel](https://www.stevewaybuildersllc.com/hs-fs/file-16070467-jpg/images/old_shower_and_stool_before_remodel.jpg?width=266&height=200&name=old_shower_and_stool_before_remodel.jpg) | ![Remodeled Marble Enclosed Shower](https://www.stevewaybuildersllc.com/hs-fs/file-16071701-jpg/images/remodeled_marble_enclosed_shower.jpg?width=180&height=240&name=remodeled_marble_enclosed_shower.jpg) ![Remodeled Bathroom Shower After](https://www.stevewaybuildersllc.com/hs-fs/file-16071287-jpg/images/remodeled_bathroom_shower_after.jpg?width=180&height=240&name=remodeled_bathroom_shower_after.jpg) |
| ![Old Linen Closet](https://www.stevewaybuildersllc.com/hs-fs/file-16070402-jpg/images/old_linen_closet.jpg?width=266&height=200&name=old_linen_closet.jpg) | ![Remodeled Custom Bathroom Linen Closet](https://www.stevewaybuildersllc.com/hs-fs/file-16071404-jpg/images/remodeled_custom_bathroom_linen_closet.jpg?width=180&height=240&name=remodeled_custom_bathroom_linen_closet.jpg) ![Remodeled Custom Linen Closet After](https://www.stevewaybuildersllc.com/hs-fs/file-16071457-jpg/images/remodeled_custom_linen_closet_after.jpg?width=180&height=240&name=remodeled_custom_linen_closet_after.jpg) |

[![Click me](https://no-cache.hubspot.com/cta/default/95604/697834bb-0edc-452d-af33-847d8e042245.png)](https://cta-redirect.hubspot.com/cta/redirect/95604/697834bb-0edc-452d-af33-847d8e042245)           [![Click me](https://no-cache.hubspot.com/cta/default/95604/9d70573b-e406-47a1-800e-3d8e1df9c177.png)](https://cta-redirect.hubspot.com/cta/redirect/95604/9d70573b-e406-47a1-800e-3d8e1df9c177)

### Steve Way Builders, LLC The Remodeling Specialist General Contractor

### 6714 Cardinal Lane Lansing, MI 48917 **Phone: (517) 323-1187**

### [Click to Contact the Remodeling Specialist ](https://www.stevewaybuildersllc.com/contact-us-0/)

### Follow the Remodeling Specialist On:

<http://www.linkedin.com/pub/steve-way/1a/a17/570><https://www.facebook.com/143011295769788>

### Bathroom Construction Photos

Construction photos of the bathroom remodel.

- ![Shower area demolished to bare studs. Bulkhead above old shower removed to the pitch of the dormer to gain more head room for the new shower.](https://www.stevewaybuildersllc.com/hs-fs/file-16082913-jpg/gallery/album/3609/shower_demo_for_remodel_project_1.jpg "Shower area demolished to bare studs. Bulkhead above old shower removed to the pitch of the dormer to gain more head room for the new shower.")
  
   Shower area demolished to bare studs. Bulkhead above old shower removed to the pitch of the dormer to gain more head room for the new shower.
- ![Vanity area with new drywall installed. Vanity plumbing, stool plumbing, laundry shoot, and toe kick heat cut out from drywall.](https://www.stevewaybuildersllc.com/hs-fs/file-16082527-jpg/gallery/album/3609/bathroom_remodel_vanity_drywall_and_plumbing.jpg "Vanity area with new drywall installed. Vanity plumbing, stool plumbing, laundry shoot, and toe kick heat cut out from drywall.")
  
   Vanity area with new drywall installed. Vanity plumbing, stool plumbing, laundry shoot, and toe kick heat cut out from drywall.
- ![Installation of the marble walls for the shower.](https://www.stevewaybuildersllc.com/hs-fs/file-16082672-jpg/gallery/album/3609/marble_wall_shower_enclosure.jpg "Installation of the marble walls for the shower.")
  
   Installation of the marble walls for the shower.
- ![Bathroom vanity installation with marble counter top and back splash.](https://www.stevewaybuildersllc.com/hs-fs/file-16082800-jpg/gallery/album/3609/remodeled_bathroom_vanity__installation.jpg "Bathroom vanity installation with marble counter top and back splash.")
  
   Bathroom vanity installation with marble counter top and back splash.

- [![Shower area demolished to bare studs. Bulkhead above old shower removed to the pitch of the dormer to gain more head room for the new shower.](https://www.stevewaybuildersllc.com/hs-fs/file-16082913-medium-jpg/gallery/album/3609/shower_demo_for_remodel_project_1.jpg "Shower area demolished to bare studs. Bulkhead above old shower removed to the pitch of the dormer to gain more head room for the new shower.") ](https://www.stevewaybuildersllc.com/hs-fs/file-16082913-jpg/gallery/album/3609/shower_demo_for_remodel_project_1.jpg)
- [![Vanity area with new drywall installed. Vanity plumbing, stool plumbing, laundry shoot, and toe kick heat cut out from drywall.](https://www.stevewaybuildersllc.com/hs-fs/file-16082527-medium-jpg/gallery/album/3609/bathroom_remodel_vanity_drywall_and_plumbing.jpg "Vanity area with new drywall installed. Vanity plumbing, stool plumbing, laundry shoot, and toe kick heat cut out from drywall.") ](https://www.stevewaybuildersllc.com/hs-fs/file-16082527-jpg/gallery/album/3609/bathroom_remodel_vanity_drywall_and_plumbing.jpg)
- [![Installation of the marble walls for the shower.](https://www.stevewaybuildersllc.com/hs-fs/file-16082672-medium-jpg/gallery/album/3609/marble_wall_shower_enclosure.jpg "Installation of the marble walls for the shower.") ](https://www.stevewaybuildersllc.com/hs-fs/file-16082672-jpg/gallery/album/3609/marble_wall_shower_enclosure.jpg)
- [![Bathroom vanity installation with marble counter top and back splash.](https://www.stevewaybuildersllc.com/hs-fs/file-16082800-medium-jpg/gallery/album/3609/remodeled_bathroom_vanity__installation.jpg "Bathroom vanity installation with marble counter top and back splash.") ](https://www.stevewaybuildersllc.com/hs-fs/file-16082800-jpg/gallery/album/3609/remodeled_bathroom_vanity__installation.jpg)

### The Remodelers Way Blog: Browse By Tag

- [Bathroom Remodeling (5)](https://www.stevewaybuildersllc.com/blog/topic/bathroom-remodeling)
- [Garage Remodeling (1)](https://www.stevewaybuildersllc.com/blog/topic/garage-remodeling)
- [Introduction (1)](https://www.stevewaybuildersllc.com/blog/topic/introduction)
- [Kitchen Remodeling (5)](https://www.stevewaybuildersllc.com/blog/topic/kitchen-remodeling)
- [Project News/Updates (8)](https://www.stevewaybuildersllc.com/blog/topic/project-newsupdates)
- [Questions/Tips (4)](https://www.stevewaybuildersllc.com/blog/topic/questionstips)

[see all](https://www.stevewaybuildersllc.com/photos/remodeling-bathrooms/bathroom-renovation-full-remodel#)

© 2015 stevewaybuildersllc.com